The Minton – Post Renovation Two Years On – Part 2

Second part of our post two years into staying at The Minton, and this time round, my notes on what we’re planning for our mini-renovation project next year.

To be fair; much of our apartment is still swimmingly fine and without any real major issues. Well, apart from that half of our initially installed LED Downlights failed, though thankfully the replacement units we bought from a different vendor have worked just fine and we’ve been able to dismount the faulty ones and mount the new units without too much difficulty on our own. And there’s also the slowly de-coloring grouting in the living/dining hall that would likely cost a lot to replace, never mind the having to move all our furniture somewhere while it gets rectified.

So – that aside, here’s what we’re currently planning.

Re-purposing our Study Room

This is the ‘+1’ in our apartment. The room as delivered is just long and wide enough for a study table that can run along the full length of the wall. But our initial renovation intention from 2014 was to treat this as a mini-library. Basically, we had our ID design and fabricate strong and reinforced book shelves. The book shelves almost 30 months later have borne up incredibly well – zero sagging despite bearing the weight of a lot of our books – paperbacks, very large coffee table books, and even heavier photo albums. The remaining space held Peter’s cot after we moved in.

A couple months back though we decided to move him out of the cot to join Hannah in their bedroom (something about wanting the kids to enjoy each other’s company more), gave his cot away to a Minton neighbor who was just about to deliver her baby – and now we have a room that looks like this:

Empty room - what to do with it?
Empty room – what to do with it?

We can’t fit a full-sized upright piano in the room, so that was tossed early on. Alternatively, the room can maybe hold a 50-60 cm deep study table on the opposing wall – we’ll likely have a designer fabricate one so that it can run the length of the wall, though there’s really enough table surfaces elsewhere in the house for us to do work – with books or multiple notebooks.

The last possible function: toss in a bean bag, and just treat it as a lounging area.:)

And we’ll likely have to find a different fan configuration for the room too. The current Crestar Idol 30″ ceiling fan is attractively looking, but is also severely constrained in its ability to move air around because of the room’s size and keep persons in it cool.

Paintwork

Not the entire house for sure, but little spots especially in the external parts of the apartment. There’re a few hairline cracks on the balcony wall – nothing serious of course though a little unsightly:

Very minor hairline crack.
Very minor hairline crack.

And maybe just a mite more serious are these paint bubbles that have started appearing on the front balcony wall. We reckon it’s that there’s some water seeping into the underlining paint layers, and we’ll have to watch if it gets more serious in the next months. And if it does, whether something needs to be done about it.

Paint bubbles. Sightly photoshopped to show the effect, but it's really not visible to the eye from any more than 2 feet away.
Paint bubbles. Sightly photoshopped to show the effect, but it’s really not visible to the eye from any more than 2 feet away.

Fans

Our unit’s facing means that we get terrifically frequent breezes and outright strong winds about 4 months a year – usually from around October to February. On the other hand, the front-balcony also gets a royal roasting from direct sun between April to October. It’s great for Ling’s plants of course, but it’s also gets terrifically hot that apart from the occasional laundry and also for the several rows of Ling’s plants, we really can’t do anything else on that balcony. This was one thing we didn’t fully anticipate in our main renovation project. Specifically, we should have fitted one of those industrial-sized ceiling fans from the get-go.

Since we can’t enclose the entire balcony in glass and just air-condition the thing up – and mind you, I am ready to fork out that expense if such major alterations were permitted – Renovation Project 2017 will see a new fan mounted on the ceiling.

Front balcony desperately needs a ceiling fan in hot and humid Singapore.
Front balcony desperately needs a ceiling fan in hot and humid Singapore.

And we’re also thinking of installing a fan into the kitchen too. Crazy idea eh? We really like our Minton home, but if there’s one thing I can name about it being deficient compared to our first home @ The Rivervale, it’s that the latter’s kitchen was large and so airy that we routinely had to close the kitchen windows to cook, as the frequent breezes was causing havoc on the gas stove flames. Our Minton unit’s kitchen is smaller, more claustrophobic, and just doesn’t move air well. I don’t know how Ling manages it when she cooks, but it’s terrifically uncomfortable for me, the Must-Have-Air-Conditioning-Everywhere-I-Am person I am.

Messy kitchen.
Messy kitchen.

Though whether we can even find a ceiling fan for this setup is going to be a long shot even. We might have to make do with a wall-mounted fan.