The Facebook group reported a couple of significant improvements to the ongoing construction of The Minton, so I went by again on Saturday noon time for a photo-look-about. The cascading waterfall has indeed been finally completed with its water pumps started a few days ago, and all three pools – the main, 50m lap and heated – have been filled. It still seems though like a lot of additional work is still remaining – a couple of amenities are still undergoing construction and the like – and I’m not sure if we’re going to be getting keys in a few weeks that other residents are hoping for.
Sky was very sunny and weather very hot too, but the circular polarizer worked pretty well this time for several of the wide-angle shots. I brought my two m4/3 cameras again. Oddly, the E-PL2 with the 12-50mm doesn’t work well at all. Lots of pictures taken suffer from an odd loss of sharpness, even when shot at 1/60s shutter speeds and faster.
Recent comments