Work-in-Progress – Part 7

It’s the Hari Raya Puasa, or breaking of the Ramadan fast public holiday today. Ling has been feeling quite under the weather with a week long coughing spell, but nonetheless was still well enough for us to swing by The Minton condo while on our way to brunch. Our stopover point this time was Blk 142 level 12 again, which we last checked out our new home in construction 5 months ago in March. The view looks quite different now, but as always, pictures will tell the story.=)

blog-2012-minton-OMD08872
The Minton, about 16 months away from expected completion.
blog-2012-minton-OMD08886
Our unit on the left hand side! One side of the balcony – the planter area perhaps – has railings installed, instead of glass panes like the front-facing side of the balcony.
blog-2012-minton-OMD08892
The cascading waterfall section in construction. Our unit faces this section, and we should get some pretty scenic views looking down from the balcony next time (or so we hope!).
blog-2012-minton-OMD08898
Mitsubishi Electric air-conditioning units still in the box sitting on each floor and ready for mounting.
blog-2012-minton-OMD08911
According to the map layout, this rectangular thing will be the 50m lap pool.
blog-2012-minton-OMD08907
No Minton blog will be complete without pictures of Hannah, since the place is really to get her into our school of choice.=) Got some nice bokeh using the Panasonic 45-200mm lens.
blog-2012-minton-OMD08922
A last look at our block from the ground floor before heading back out to brunch.=)

1 thought on “Work-in-Progress – Part 7

  1. Looks good! That’s the power of parents’ love – to move house for the sake of our children!

Comments are closed.