It’s been more than two months since our last entry of our new home @ The Minton condo. We’d actually visited the construction site as recently as a month ago with Matt (the next time he visits us we’d probably would have moved out of The Rivervale already and into this new home) but didn’t blog about that visit then. Our vantage point again was at Blk 158 Level 11.

It looks like the temporary workers’ accommodation and office building has been completely torn down, and in its place, what seems to be the clubhouse. I’ve been looking at the suggested project layout though and the spot where that building’s constructed should be actually the drive way LOL.

Hannah extra chirpy with her toy fashioned out of Fairprice receipts.

Next visit we’ll check out the view from Blk 142 Lvl 12.

1 thought on “Work-in-Progress – Part 6

  1. was there this afternoon..construction progress is gd..hopefully we can shift in 2013